Chargelab at 200 Longwood Avenue
200 Longwood Avenue, Boston, MA 02115
- Max power
- 7.2 kW
- Level 2
- Charging ports
- 8
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
Chargelab at 200 Longwood Avenue is a Level 2 station run by Chargelab at 200 Longwood Avenue in Boston, MA. It has 8 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app.
How long will charging take?
Range added per hour
~24mi
10% to 80%, 77 kWh battery
~8.3hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
8 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Chargelab app shows the live rate before you start.
Location and access
- Address
- 200 Longwood Avenue
Boston, MA 02115 - Coordinates
- 42.33649, -71.10248
- Hours
- Not listed
- Phone
- 800-636-0986
- Network
- Chargelab
Questions drivers ask
How fast is Chargelab at 200 Longwood Avenue?
It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Chargelab at 200 Longwood Avenue?
Chargelab has not published a fixed price for this site. Rates are shown in the Chargelab app or on the charger screen before you start a session.
What plugs does Chargelab at 200 Longwood Avenue have?
8 × J1772 (Type 1) up to 7 kW.
Is Chargelab at 200 Longwood Avenue open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 455752. Last confirmed by the network on Oct 11, 2026; opened Mar 18, 2026.