Skip to content
ChargePulse
Level 2 Red E

Dougherty Commons

45 Dougherty Court, Portland, ME 04102

Max power
9.6 kW
Level 2
Charging ports
18
J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Dougherty Commons is a Level 2 station run by Red E at 45 Dougherty Court in Portland, ME. It has 18 charging ports with J1772 connectors and delivers up to 9.6 kw. Pricing is set by the network app.

How long will charging take?

Range added per hour

~32mi

10% to 80%, 77 kWh battery

~6.2hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

18 ports · 10 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Red E app shows the live rate before you start.

Location and access

Address
45 Dougherty Court
Portland, ME 04102
Coordinates
43.65709, -70.28693
Hours
Not listed
Network
Red E

Questions drivers ask

How fast is Dougherty Commons?

It is a Level 2 station delivering up to 10 kW, which adds roughly 32 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Dougherty Commons?

Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.

What plugs does Dougherty Commons have?

18 × J1772 (Type 1) up to 10 kW.

Is Dougherty Commons open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 418160. Last confirmed by the network on Oct 11, 2026; opened Aug 14, 2025.