City of Suwanee
330 Town Center Ave, Suwanee, GA 30024
- Max power
- 11.7 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- $0.40/kWh
- Per network listing
- Hours
- 24/7
- Open all day
City of Suwanee is a Level 2 station run by Envirospark at 330 Town Center Ave in Suwanee, GA. It has 4 charging ports with J1772 connectors and delivers up to 11.7 kw. Listed pricing is $0.40/kWh, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~38mi
10% to 80%, 77 kWh battery
~5.2hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 12 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
$0.40/kWh
Network listing: “$0.40 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $21.56 before taxes and idle fees.
Location and access
- Address
- 330 Town Center Ave
Suwanee, GA 30024 - Coordinates
- 34.05537, -84.06375
- Hours
- 24/7Google Pay
- Phone
- 770-945-8996
- Network
- Envirospark
- On site
- 24/7 Access
Questions drivers ask
How fast is City of Suwanee?
It is a Level 2 station delivering up to 12 kW, which adds roughly 38 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at City of Suwanee?
The listed rate is $0.40/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $22 before taxes and idle fees.
What plugs does City of Suwanee have?
4 × J1772 (Type 1) up to 12 kW.
Is City of Suwanee open 24/7?
Yes, the network lists it as open 24 hours a day. Note: Google Pay.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 68859. Last confirmed by the network on Nov 13, 2025; opened Jul 1, 2015.