111 Park Street - FRONT
112 Park St, New Haven, CT 06511
- Max power
- 9.6 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
111 Park Street - FRONT is a Level 2 station run by Independent at 112 Park St in New Haven, CT. It has 4 charging ports with J1772 connectors and delivers up to 9.6 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~32mi
10% to 80%, 77 kWh battery
~6.2hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 10 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Independent app shows the live rate before you start.
Location and access
- Address
- 112 Park St
New Haven, CT 06511 - Coordinates
- 41.30691, -72.93518
- Finding the chargers
- Located in the front of the building.
- Hours
- 24/7
- Phone
- NA
- On site
- 24/7 Access
Questions drivers ask
How fast is 111 Park Street - FRONT?
It is a Level 2 station delivering up to 10 kW, which adds roughly 32 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at 111 Park Street - FRONT?
Independent has not published a fixed price for this site. Rates are shown in the Independent app or on the charger screen before you start a session.
What plugs does 111 Park Street - FRONT have?
4 × J1772 (Type 1) up to 10 kW.
Is 111 Park Street - FRONT open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 333881. Last confirmed by the network on May 9, 2024; opened Dec 13, 2023.