Ampup at 315 Buckingham
315 Buckingham St, Hartford, CT 06106
- Max power
- Up to 7.2 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- $0.31/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Ampup at 315 Buckingham is a Level 2 station run by Ampup at 315 Buckingham St in Hartford, CT. It has 4 charging ports with J1772 connectors and delivers up to 7.2 kw. Listed pricing is $0.31/kWh, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~24mi
10% to 80%, 77 kWh battery
~8.3hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
$0.31/kWh
Network listing: “$0.31 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $16.71 before taxes and idle fees.
Location and access
- Address
- 315 Buckingham St
Hartford, CT 06106 - Coordinates
- 41.76115, -72.68110
- Hours
- 24/7
- Phone
- 860-916-5944
- Network
- Ampup
- On site
- 24/7 Access
Questions drivers ask
How fast is Ampup at 315 Buckingham?
It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Ampup at 315 Buckingham?
The listed rate is $0.31/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $17 before taxes and idle fees.
What plugs does Ampup at 315 Buckingham have?
4 × J1772 (Type 1) up to 7 kW.
Is Ampup at 315 Buckingham open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 415819. Last confirmed by the network on Aug 12, 2025; opened Jun 5, 2024.