Allen Construction
201 N Milpas St, Santa Barbara, CA 93103
- Max power
- Up to 7.2 kW
- Level 2
- Charging ports
- 3
- J1772
- Price
- Free
- No charging fee listed
- Hours
- See hours
- 8am-5pm M-F; employee use prioritized, call to register with front desk before arrival; maximum 3 hours
Allen Construction is a Level 2 station run by Independent at 201 N Milpas St in Santa Barbara, CA. It has 3 charging ports with J1772 connectors and delivers up to 7.2 kw. Charging is free.
How long will charging take?
Range added per hour
~24mi
10% to 80%, 77 kWh battery
~8.3hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
3 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Free
Network listing: “Free”
Location and access
- Address
- 201 N Milpas St
Santa Barbara, CA 93103 - Coordinates
- 34.42343, -119.68182
- Hours
- 8am-5pm M-F; employee use prioritized, call to register with front desk before arrival; maximum 3 hours
- Phone
- 805-884-8777
Questions drivers ask
How fast is Allen Construction?
It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Allen Construction?
Charging is listed as free. Parking fees or time limits may still apply.
What plugs does Allen Construction have?
3 × J1772 (Type 1) up to 7 kW.
Is Allen Construction open 24/7?
Listed hours: 8am-5pm M-F; employee use prioritized, call to register with front desk before arrival; maximum 3 hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 70575. Last confirmed by the network on Nov 13, 2025; opened Feb 21, 2013.