Skip to content
ChargePulse
Level 2 Chargie

Chargie at 50 Park Place

50 Park Pl, Brisbane, CA 94005

Max power
7.7 kW
Level 2
Charging ports
10
J1772
Price
$0.40/kWh
Per network listing
Hours
24/7
Open all day

Chargie at 50 Park Place is a Level 2 station run by Chargie at 50 Park Pl in Brisbane, CA. It has 10 charging ports with J1772 connectors and delivers up to 7.7 kw. Listed pricing is $0.40/kWh, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~25mi

10% to 80%, 77 kWh battery

~7.8hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

10 ports · 8 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

$0.40/kWh

Network listing: “$0.40 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $21.56 before taxes and idle fees.

Location and access

Address
50 Park Pl
Brisbane, CA 94005
Coordinates
37.68682, -122.40301
Hours
24/7
Network
Chargie
On site
24/7 Access

Questions drivers ask

How fast is Chargie at 50 Park Place?

It is a Level 2 station delivering up to 8 kW, which adds roughly 25 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Chargie at 50 Park Place?

The listed rate is $0.40/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $22 before taxes and idle fees.

What plugs does Chargie at 50 Park Place have?

10 × J1772 (Type 1) up to 8 kW.

Is Chargie at 50 Park Place open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 261819. Last confirmed by the network on Jan 13, 2026; opened Mar 19, 2023.