Chandler-Gilbert Community College
7360 East Tahoe Avenue, Mesa, AZ 85212
- Max power
- 10.4 kW
- Level 2
- Charging ports
- 8
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Chandler-Gilbert Community College is a Level 2 station run by Blink at 7360 East Tahoe Avenue in Mesa, AZ. It has 8 charging ports with J1772 connectors and delivers up to 10.4 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~34mi
10% to 80%, 77 kWh battery
~5.8hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
8 ports · 10 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Blink app shows the live rate before you start.
Location and access
- Address
- 7360 East Tahoe Avenue
Mesa, AZ 85212 - Coordinates
- 33.31198, -111.67480
- Hours
- 24/7
- Phone
- 888-998-2546
- Network
- Blink
- On site
- 24/7 Access
Questions drivers ask
How fast is Chandler-Gilbert Community College?
It is a Level 2 station delivering up to 10 kW, which adds roughly 34 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Chandler-Gilbert Community College?
Blink has not published a fixed price for this site. Rates are shown in the Blink app or on the charger screen before you start a session.
What plugs does Chandler-Gilbert Community College have?
8 × J1772 (Type 1) up to 10 kW.
Is Chandler-Gilbert Community College open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 422261. Last confirmed by the network on Oct 11, 2026; opened Sep 15, 2025.