Skip to content
ChargePulse
Level 2 Independent

Berube Chevrolet Cadillac Buick GMC

101 boul. Cartier, Riviere-du-Loup, QC G5R 2N3

Max power
Up to 7.2 kW
Level 2
Charging ports
1
J1772
Price
Free
No charging fee listed
Hours
24/7
Open all day

Berube Chevrolet Cadillac Buick GMC is a Level 2 station run by Independent at 101 boul. Cartier in Riviere-du-Loup, QC. It has 1 charging port with J1772 connectors and delivers up to 7.2 kw. Charging is free, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~39km

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

1 port · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Free

Network listing: “Free”

Location and access

Address
101 boul. Cartier
Riviere-du-Loup, QC G5R 2N3
Coordinates
47.84832, -69.53753
Hours
24/7App
On site
Restrooms24/7 Access

Questions drivers ask

How fast is Berube Chevrolet Cadillac Buick GMC?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Berube Chevrolet Cadillac Buick GMC?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does Berube Chevrolet Cadillac Buick GMC have?

1 × J1772 (Type 1) up to 7 kW.

Is Berube Chevrolet Cadillac Buick GMC open 24/7?

Yes, the network lists it as open 24 hours a day. Note: App.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 84662. Last confirmed by the network on Apr 10, 2020; opened Jul 15, 2015.