SQI - Palais de justice de Montréal
907 boul. St-Laurent, Montréal, QC H2Z 1J4
- Max power
- 7.2 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
SQI - Palais de justice de Montréal is a Level 2 station run by FLO at 907 boul. St-Laurent in Montréal, QC. It has 4 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~39km
10% to 80%, 77 kWh battery
~8.3hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The FLO app shows the live rate before you start.
Location and access
- Address
- 907 boul. St-Laurent
Montréal, QC H2Z 1J4 - Coordinates
- 45.50743, -73.55768
- Hours
- 24/7
- Phone
- 888-356-8911
- Network
- FLO
- On site
- 24/7 Access
Questions drivers ask
How fast is SQI - Palais de justice de Montréal?
It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at SQI - Palais de justice de Montréal?
FLO has not published a fixed price for this site. Rates are shown in the FLO app or on the charger screen before you start a session.
What plugs does SQI - Palais de justice de Montréal have?
4 × J1772 (Type 1) up to 7 kW.
Is SQI - Palais de justice de Montréal open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 146704. Last confirmed by the network on Oct 11, 2026; opened Oct 9, 2019.