Skip to content
ChargePulse
Level 2 Circuit électrique

MRC des Laurentides - Sentier des Cimes

737, Rue de la Pisciculture, Mont-Blanc, QC J0T 1J2

Max power
11.5 kW
Level 2
Charging ports
6
J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

MRC des Laurentides - Sentier des Cimes is a Level 2 station run by Circuit électrique at 737, Rue de la Pisciculture in Mont-Blanc, QC. It has 6 charging ports with J1772 connectors and delivers up to 11.5 kw. Pricing is set by the network app.

How long will charging take?

Range added per hour

~61km

10% to 80%, 77 kWh battery

~5.2hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

6 ports · 12 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Circuit électrique app shows the live rate before you start.

Location and access

Address
737, Rue de la Pisciculture
Mont-Blanc, QC J0T 1J2
Coordinates
46.11363, -74.50555
Hours
Not listed

Questions drivers ask

How fast is MRC des Laurentides - Sentier des Cimes?

It is a Level 2 station delivering up to 12 kW, which adds roughly 38 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at MRC des Laurentides - Sentier des Cimes?

Circuit électrique has not published a fixed price for this site. Rates are shown in the Circuit électrique app or on the charger screen before you start a session.

What plugs does MRC des Laurentides - Sentier des Cimes have?

6 × J1772 (Type 1) up to 12 kW.

Is MRC des Laurentides - Sentier des Cimes open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 312144. Last confirmed by the network on Oct 11, 2026; opened Sep 30, 2023.