Skip to content
ChargePulse
Level 2 Circuit électrique

Ville de La Prairie - Centre multifonctionnel Guy-Dupré

500, Saint-Laurent, La Prairie, QC J5R 5X2

Max power
7.2 kW
Level 2
Charging ports
4
J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Ville de La Prairie - Centre multifonctionnel Guy-Dupré is a Level 2 station run by Circuit électrique at 500, Saint-Laurent in La Prairie, QC. It has 4 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app.

How long will charging take?

Range added per hour

~39km

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

4 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Circuit électrique app shows the live rate before you start.

Location and access

Address
500, Saint-Laurent
La Prairie, QC J5R 5X2
Coordinates
45.41467, -73.49898
Hours
Not listed

Questions drivers ask

How fast is Ville de La Prairie - Centre multifonctionnel Guy-Dupré?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Ville de La Prairie - Centre multifonctionnel Guy-Dupré?

Circuit électrique has not published a fixed price for this site. Rates are shown in the Circuit électrique app or on the charger screen before you start a session.

What plugs does Ville de La Prairie - Centre multifonctionnel Guy-Dupré have?

4 × J1772 (Type 1) up to 7 kW.

Is Ville de La Prairie - Centre multifonctionnel Guy-Dupré open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 306075. Last confirmed by the network on Oct 11, 2026; opened Jul 17, 2019.