Skip to content
ChargePulse
Level 2 Evstart

Evstart at 53 Thorncliffe Park Dr

53 Thorncliffe Park Dr, Toronto, ON M4H1L1

Max power
6.7 kW
Level 2
Charging ports
4
J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Evstart at 53 Thorncliffe Park Dr is a Level 2 station run by Evstart at 53 Thorncliffe Park Dr in Toronto, ON. It has 4 charging ports with J1772 connectors and delivers up to 6.7 kw. Pricing is set by the network app.

How long will charging take?

Range added per hour

~35km

10% to 80%, 77 kWh battery

~8.9hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

4 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Evstart app shows the live rate before you start.

Location and access

Address
53 Thorncliffe Park Dr
Toronto, ON M4H1L1
Coordinates
43.70309, -79.34145
Hours
Not listed
Network
Evstart

Questions drivers ask

How fast is Evstart at 53 Thorncliffe Park Dr?

It is a Level 2 station delivering up to 7 kW, which adds roughly 22 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Evstart at 53 Thorncliffe Park Dr?

Evstart has not published a fixed price for this site. Rates are shown in the Evstart app or on the charger screen before you start a session.

What plugs does Evstart at 53 Thorncliffe Park Dr have?

4 × J1772 (Type 1) up to 7 kW.

Is Evstart at 53 Thorncliffe Park Dr open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 455166. Last confirmed by the network on Oct 11, 2026; opened Mar 18, 2026.