Chargelab at 208 Enfield Place
208 Enfield Pl, Mississauga, ON L5B 0G8
- Max power
- 11.5 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
Chargelab at 208 Enfield Place is a Level 2 station run by Chargelab at 208 Enfield Pl in Mississauga, ON. It has 4 charging ports with J1772 connectors and delivers up to 11.5 kw. Pricing is set by the network app.
How long will charging take?
Range added per hour
~61km
10% to 80%, 77 kWh battery
~5.2hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 12 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Chargelab app shows the live rate before you start.
Location and access
- Address
- 208 Enfield Pl
Mississauga, ON L5B 0G8 - Coordinates
- 43.59198, -79.63446
- Hours
- Not listed
- Phone
- 800-636-0986
- Network
- Chargelab
Questions drivers ask
How fast is Chargelab at 208 Enfield Place?
It is a Level 2 station delivering up to 12 kW, which adds roughly 38 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Chargelab at 208 Enfield Place?
Chargelab has not published a fixed price for this site. Rates are shown in the Chargelab app or on the charger screen before you start a session.
What plugs does Chargelab at 208 Enfield Place have?
4 × J1772 (Type 1) up to 12 kW.
Is Chargelab at 208 Enfield Place open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 360110. Last confirmed by the network on Oct 11, 2026; opened Oct 17, 2024.