Skip to content
ChargePulse
Level 2 OpConnect

Canway Inn & Suites Dauphin

1601 Main St S, Dauphin, MB R7N 2V4

Max power
8.3 kW
Level 2
Charging ports
4
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Canway Inn & Suites Dauphin is a Level 2 station run by OpConnect at 1601 Main St S in Dauphin, MB. It has 4 charging ports with J1772 connectors and delivers up to 8.3 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~43km

10% to 80%, 77 kWh battery

~7.2hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

4 ports · 8 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The OpConnect app shows the live rate before you start.

Location and access

Address
1601 Main St S
Dauphin, MB R7N 2V4
Coordinates
51.13264, -100.06429
Hours
24/7
Network
OpConnect
On site
24/7 Access

Questions drivers ask

How fast is Canway Inn & Suites Dauphin?

It is a Level 2 station delivering up to 8 kW, which adds roughly 27 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Canway Inn & Suites Dauphin?

OpConnect has not published a fixed price for this site. Rates are shown in the OpConnect app or on the charger screen before you start a session.

What plugs does Canway Inn & Suites Dauphin have?

4 × J1772 (Type 1) up to 8 kW.

Is Canway Inn & Suites Dauphin open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 332336. Last confirmed by the network on Oct 11, 2026; opened Apr 16, 2024.