Skip to content
ChargePulse
Level 2 FLO

Pacific Corporate Centre - Building B

19543 34A Avenue, Surrey, BC V3Z 1A5

Max power
6.2 kW
Level 2
Charging ports
6
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Pacific Corporate Centre - Building B is a Level 2 station run by FLO at 19543 34A Avenue in Surrey, BC. It has 6 charging ports with J1772 connectors and delivers up to 6.2 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~32km

10% to 80%, 77 kWh battery

~9.7hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

6 ports · 6 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The FLO app shows the live rate before you start.

Location and access

Address
19543 34A Avenue
Surrey, BC V3Z 1A5
Coordinates
49.06505, -122.68397
Hours
24/7
Network
FLO
On site
24/7 Access

Questions drivers ask

How fast is Pacific Corporate Centre - Building B?

It is a Level 2 station delivering up to 6 kW, which adds roughly 20 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Pacific Corporate Centre - Building B?

FLO has not published a fixed price for this site. Rates are shown in the FLO app or on the charger screen before you start a session.

What plugs does Pacific Corporate Centre - Building B have?

6 × J1772 (Type 1) up to 6 kW.

Is Pacific Corporate Centre - Building B open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 330208. Last confirmed by the network on Oct 11, 2026; opened Mar 12, 2024.