Staybridge Suites Red Deer North
6329 Orr Dr, Red Deer, AB T4P 3T6
- Max power
- Up to 7.2 kW
- Level 2
- Charging ports
- 2
- J1772
- Price
- Free
- No charging fee listed
- Hours
- 24/7
- Open all day
Staybridge Suites Red Deer North is a Level 2 station run by Independent at 6329 Orr Dr in Red Deer, AB. It has 2 charging ports with J1772 connectors and delivers up to 7.2 kw. Charging is free, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~39km
10% to 80%, 77 kWh battery
~8.3hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
2 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Free
Network listing: “Free”
Location and access
- Address
- 6329 Orr Dr
Red Deer, AB T4P 3T6 - Coordinates
- 52.28524, -113.85065
- Hours
- 24/7for client use only
- Phone
- 587-457-5851
- On site
- LodgingRestrooms24/7 Access
Questions drivers ask
How fast is Staybridge Suites Red Deer North?
It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Staybridge Suites Red Deer North?
Charging is listed as free. Parking fees or time limits may still apply.
What plugs does Staybridge Suites Red Deer North have?
2 × J1772 (Type 1) up to 7 kW.
Is Staybridge Suites Red Deer North open 24/7?
Yes, the network lists it as open 24 hours a day. Note: for client use only.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 241172. Last confirmed by the network on Feb 13, 2026; opened Dec 27, 2022.